Back to Projects page

Southern Pines, North Carolina

Lee Job#: 4245
Contract Amount: $14,320,188
Owner: NCDOT

Lee is working on this design build project in Division Eight for the DOT. Teamed with design engineer RS & H to replace eleven bridges on secondary routes in the division. This includes demolition, drilled shaft and driven pile foundations, cast in place substructure and superstructures including cored slabs, box girders, steel and concrete beams. Work started in 2013 and is finishing up in early 2016.